MUST Lithium battery production line overview and installation with inverter

Step 1:Using multimeter test each cells voltage to selete high quality cells, then arrange the cells in accordance with the battery capacity required

Step 2: Automatic point tin

Step 3:Connect cables and BMS board:

Step 4: Complete the outside shell then doing aging test:


Step 5:Package
Lead acid shell and rack mount package with carton box, wall mount with wooden box
Package of wall mount 48v 200ah:

Smart LCD display of wall mount battery:

Installation in solar system:

Our lithium battery will make communicate with MUST inverter first, in future also will make cummunicate with other brand inverter. Welcome customize your brand.